Grid-forming inverters can support frequency and voltage as synchronous inertia declines, but the value is only real when objectives are defined and models are verified against tests.
The main shift: instead of “ride through and don’t trip,” planners increasingly need inverters to actively contribute to stability under weak-grid and contingency conditions.
Start with a clear acceptance test plan. If you cannot measure/verify it, you cannot count on it in system studies.